Process heating and cooling, compressed air, HVAC, lighting, on site generation (e.g., solar PV, CHP), motors driven systems (e.g., pumps, fans), industrial heat pumps
Opportunity for federal implementation grants for small/medium manufacturers based on report recommendations
Up to $300K/quarter and 50% total cost
<$100M annual sales
$100K to $3.5M annual energy bills
<500 employees at site
Free assessment
Start: schedule free assessment
Send pre-site visit information
SIC/NAICS code, size of the plant, operating hours, and location
Manufacturing processes, HVAC, and major equipment with sizes
Challenges we can help with
Utility bills for 1-2 year/s – electric, gas, water
If available, electric interval (15-minute) data from utility
If available, process data that is being collected
Site assessment visit – at least ½ day
Introductions, safety review, and review of analysis of pre-site visit data
Plant tour with Q&A
Internal team strategy planning
Plant data gathering with installation of Internet connected (IoT) sensors
Preliminary results review, feedback, and wrap up
Assessment report with recommendations in 30 days
Cost, savings, and payback analysis including incentives
3 capital projects for implementation grants (e.g. solar PV)
3 low lying fruit projects
More ideas for later details analysis
IoT sensor demonstration
Proposal for possible next steps
Implementation grant applications for potential capital projects
Implementation support (based on proposal with report)