Healthy Building Solution

Data and analytics for improving industrial processes and commercial building performance


Two engineers with a tablet next to a large pump in a plant

INDUSTRIAL ASSESSMENTS

Free industrial
energy & productivity
assessments.

No-cost industrial energy assessments provided by Rutgers University, covering energy, decarbonization, productivity, waste, resiliency and cyber security.

Site visit with IoT sensorsReport in 30 daysImplementation grants

WHO QUALIFIES

Small and medium manufacturers.

Eligibility for the no-cost assessment
and federal implementation grants.

<$100MAnnual sales
$100K–$3.5MAnnual energy bills
<500Employees at the site
Up to $300KImplementation grants per quarter, up to 50% of total cost, based on report recommendations

WHAT WE LOOK AT

Systems covered.

Process heating and coolingCompressed airHVACLightingOn-site generation (solar PV, CHP)Motor-driven systems (pumps, fans)Industrial heat pumps

HOW IT WORKS

From first data to implementation.

  1. Laptop showing energy dashboards next to printed charts and a floor plan01

    Pre-site information

    • SIC/NAICS code, plant size, operating hours and location
    • Manufacturing processes, HVAC and major equipment with sizes
    • Challenges HBS can help with
    • Utility bills for 1–2 years (electric, gas, water)
    • Electric 15-minute interval data and process data, if available
  2. Assessment team installing a sensor on a pump motor in a production plant02

    Site assessment visit (at least ½ day)

    • Introductions, safety review and review of the pre-site analysis
    • Plant tour with Q&A
    • Internal team strategy planning
    • Data gathering with internet-connected (IoT) sensors
    • Preliminary results review, feedback and wrap-up
  3. Two people reviewing energy dashboards on a wall screen in a meeting room03

    Report with recommendations in 30 days

    • Cost, savings and payback analysis, with incentives shown separately
    • 3 capital projects for implementation grants (e.g. solar PV)
    • 3 low-hanging-fruit projects
    • More ideas for later, detailed analysis
    • IoT sensor demonstration
  4. Technician fitting a small sensor to an electric motor on a factory floor04

    Next steps

    • Proposal for possible next steps
    • Implementation grant applications for capital projects
    • Implementation support, based on the proposal
    • Implementation survey 9 months later

Copyright 2025

Powered by Wild Apricot Membership Software